We're connecting our growing communities with more frequent and reliable train services between Brisbane, Logan and the Gold Coast.
Get updates for
Logan to Gold Coast Faster Rail Project
The Logan and Gold Coast Faster Rail project will double the number of tracks between Kuraby and Beenleigh to allow the free movement of both all-stops and express trains. The project will also upgrade stations to improve accessibility, remove level crossings and improve park ‘n’ ride facilities.
The rail line between Kuraby and Beenleigh is a key capacity bottleneck on the network, where trains share a single track in each direction. During peak periods, all-stop Beenleigh trains need to be held to one side to allow Gold Coast express trains to pass through.
The Logan and Gold Coast Faster Rail project will address this problem by doubling the number of tracks between Kuraby and Beenleigh to allow the free movement of both all-stops and express trains. The project will also upgrade stations to improve accessibility, remove 5 level crossings, improve park ‘n’ ride facilities, and provide a new continuous active travel path connecting to stations along the 20km project corridor.
Consultation commencement